The deals were
signed on Tuesday in a ceremony that was attended by Iranian Minister of
Petroleum Bijan Zangeneh, and are valued at a total of 1 billion dollars.
By signing
the deals, the fate of 9 packages of a total of 33 packages was determined. The
total number of 33 projects are estimated to cost 6 billion dollars in three
years.
National
Iranian South Oil Company (NISOC) signed contracts for the projects of Kaboud,
Gachsaran Khami, Lali Asmari and Nargesi with the companies of Pars
Energy-Gostar Drilling & Exploration (PEDEX), National Iranian Drilling
Company (NIDC), Petro Gohar Farasahel Kish (PGFK), and Dana Kish Drilling
Company.
NISOC also
signed two other contracts for developing Mansouri Asmari and Ramshir project
with Oil Industries' Engineering and Construction Company (OIEC).
Furthermore,
the Iranian Central Oil Fields Company signed deals for developing Danan,
Saadat Abad and Naft Shahr projects with MAPNA Group, Global Petro Tech kish
E&P Company and the NIDC.
Follow us on
Twitter @ SouthPSEEZ